Facilities

DSC_3370MetamaX proudly presents its  unique state of the art set up. We have an extreme strong all concrete building to support our heavy machinery and installations.

We are equipped with 16 / 25 mT overhead cranes. With the ideal combination of the equipment of our heavy lifting department we can handle in-house goods with a weight up to 250 mT. Production area  1450 m2 / offices 270 m2 / testing area 320 m2

Hydraulic testing with high volume and high pressure up to 700 bar ( 10.150 PSI ) Production of new parts, liners and cylinder rods of more than 10 metres in length with modern machines and ISO certified facilities. Certified welding carried out in-house.

Laser cladding and nickel – hard chrome plating at ISO certified and DNV approved facility. Capacity of 10 metres in length. The design and testing of new parts and the reconditioning of parts and cylinders with approval of all classification societies as ABS / DNV and Lloyds. Transport world-wide with a wide variety of transport equipment.

MetamaX is working together with local MetamaX approved sub suppliers. All sub suppliers are certified according to ISO  9001 and ISO 14001.